I.         CONTROL SYSTEMS DELIVERED BY ELECON LTD.

 

SITE

SYSTEM

1.

Linde Gas Hungary, Dunaújváros -

  • PLC-based automatic system
  • PC-based SCADA supervision system

 

2.

Fővárosi Csatornázási Művek – North Pest Water Sewage Plant
Turbo air blowers: 2 units

  • PLC based automatic system

 

3.

United Hungarian Glass Containers Ltd., Orosháza
Turbo compressor automatic system
Low performance system: 1 unit
High performance system: 2 units

  • PLC-based automatic system for air blowers and cooling towers
  • Auxiliary network
  • Low voltage switchgear
  • PC-based SCADA supervision system

II.        LOW VOLTAGE SYSTEMS  - PLC CONTROLLED

 

SITE

SYSTEM

1.

LEGO Manufacturing Kft., Nyíregyháza

  • 22 Kv extension
  • Low voltage reconstruction
  • Installation of new transformers (2x1,6 MVA)
  • Replacement of old MDB-s

2.

Madách Theatre, Budapest

  • PLC-based main switch control system

3.

Hotel Béke, Budapest

  • PLC-based main switch control system

4.

Hotel Erzsébet, Budapest

  • PLC-based main switch control system

5.

Duna Television, Budapest

  • PLC-based main switch control system
  • Emergency Diesel genset
  • Low voltage main switchgear

6.

InterWare ZRt. – Internet Data Center

  • PLC-based main switch control system
  • Emergency Diesel genset
  • Low voltage main switchgear
  • UPS system

7.

Ericsson Hungary

  • PLC-based main switch control system
  • Emergency Diesel genset
  • Low voltage main switchgear
  • UPS system
  • PC-based SCADA supervision system

8.

Hungarian Plasma Centre

  • PLC-based main switch control system 

9.

Hungarian Cardiologic Institute
Cardiologic Institute for Children

  • PLC-based main switch control system (2 units)
  • Emergency Diesel generator set – PLC control (3 units) 

III.      CHP SYSTEMS DEVELOPED BY ELECON LTD.

 

SITE

SYSTEM

1.

Food industry, Sárvár
Number of units: 1
Unit power

  • Electrical : 1560 kW (0,4 kV)
  • Heat         : 2300 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system

 

2.

Heat supplier – Eger
Number of units: 4
Unit power

  • Electrical : 1180 kW (0,4 kV)
  • Heat         : 1380 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system
  • Sequence control

 

3.

Heat supplier – Celldömölk
Number of units: 1
Unit power

  • Electrical : 770 kW (0,4 kV)
  • Heat         : 1150 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch

 

4.

Heat supplier – Tapolca
Number of units: 1
Unit power

  • Electrical : 1180 kW (0,4 kV)
  • Heat         : 1380 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system

 

5.

Heat supplier – Szombathely
Number of units: 1
Unit power

  • Electrical : 1180 kW (0,4 kV)
  • Heat         : 1380 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system

 

6.

Hospital – Szombathely
Number of units: 1
Unit power

  • Electrical : 770 kW (0,4 kV)
  • Heat         : 1150 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch

 

7.

Power plant – Debrecen
Number of units: 6
Unit power

  • Electrical : 2000 kW (11 kV)
  • Heat         : 2300 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system
  • Sequence control

 

8.

Heat supplier – Kaposvár
Number of units: 4
Unit power

  • Electrical : 1180 kW (0,4 kV)
  • Heat         : 1380 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system
  • Sequence control

 

 

Heat supplier – Kaposvár – Renewing an existing equipment
Number of units: 1
Unit power

  • Electrical : 700 kW (0,4 kV)
  • Heat         : 900 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system
  • Sequence control

 

9.

Site of electrical grid company E.ON
Number of units: 1
Unit power

  • Electrical : 1180 kW (0,4 kV)
  • Heat         : 1380 kW
  • PLC-based automatic system
  • Auxiliary network
  • Low voltage main switch
  • PC-based SCADA supervision system

 

10.

Ukraine, gas pipeline – Industrial engine for gas compressors
Number of units: 2

  • Axis power: 400 kW
  • PLC-based automatic system
  • PC-based SCADA supervision system

 

11.

Fővárosi Csatornázási Művek – North Pest Water Sewage Plant
Number of units: 2
Engines powered by biogas
Unit power

  • Electrical : 1100 kW (0,4 kV)
  • Heat         : 1150 kW
  • PLC-based automatic system
  • Remote control system for optimum power 

 

IV.      DATA CENTRES BUILT BY ELECON LTD.

 

SITE

SYSTEM

1.

Interware Inc. – Internet hosting company  

  • PLC-controlled network-generator automatic transfer switch and network supervision automatics
  • Low voltage inlet and main switchgear
  • Low voltage system of the 10/0,4 kV transformer station with auxiliaries, automatics and PLC-based supervision of the mechanical system
  • Collecting technological data and transferring them to the own computer supervision system of the Customer, taking part in the construction of the supervision system
  • UPS main distribution board
  • Data centre technological and UPS distribution board – to serve around 400m2 area

2.

Interware Inc. – Internet hosting company  - Extension during operation

  • Extension of the UPS system capacity 2x200kW -> 3x200kW during operation, incl. co-ordination and installation work
  • Erection, installation and commissioning of an emergency Diesel-genset
  • Consulting and expert activity for extension, operation and maintenance

3.

DATAPLEX Ltd., Budapest (former City Reach Ltd.)

  • Diesel-generator sets (5x1,6 MW) – new control system
  • Maintenance agreement for Diesel-generator sets and their control system

4.

Docler Holding, Budapest – Data Centre and Offices

  • PLC-controlled network-generator automatic transfer switch and network supervision automatics
  • Low voltage main switchgear for 3500 Amps
  • Low voltage distribution
  • UPS distribution boards
  • Emergency Diesel-generator set automatics (paralleled to the utility)
  • UPS system (flywheel and static UPS-es for redundancy) 

5.

Deninet Ltd., Budapest – Internet Server Hosting Company 

  • Data Centre distribution board
  • Erection, installation and commissioning of an emergency Diesel-genset
  • Network/Generator changeover switches (4 units) operated by a PLC automatics

6.

Proserver Ltd., Budapest – Data Centre and Internet Server Hosting Company 

  • Technical consulting
  • Operation
  • Maintenance
  • Taking part in development and extensions

 

 
mailto:elecon@elecon.hu